For
the past eight years All State has performed various projects
for UMass. This includes the installation of approximately
1,600 feet of underground utility tunnels. |
| With
depths over 18 feet, All State installed the tunnel system,
complete with the distribution of high-pressure steam
and condensate, chilled water, and electrical throughout
the campus. Past UMass projects also include nearly 2,000
feet of direct buried pre-insulated piping system, replacement
of the library chillers, as well as many other varied
and successful projects. |
 |
| |
| |
|
|
|
|
|
|